The Pool Construction - Day 4
Friday 9th April, 2010
By: Mike Werner
Location: Normandy, France
Category:  House 
 

Today, Friday, the pool company was coming to help set up the walls of the pool. After everyone got their cup of coffee Chez Werner, the panels were taken out of the packages.

They were spread out strategically.

Pool-04-01.jpg

Pool-04-02.jpg

All the boxes were unpacked and were lying around the garden. Thankfully it wasn't raining, it was nice and sunny.

Pool-04-03.jpg

Pool-04-04.jpg

Bits & pieces were fitted on the walls (skimmers, pumps, lights)

Pool-04-05.jpg

Walls were lowered into the to-be-pool.

Pool-04-06.jpg

The inside of the walls received metal roads to strengthened the cement when it gets poured.

Pool-04-07.jpg

Each wall, made out of PVC, had connectors, while the corner had the biggest connector.

Pool-04-08.jpg

Pool-04-09.jpg

Each connector was hammered into the wall. It was like watching kids making a Lego toy....

Pool-04-10.jpg

One side was put up in 1 hour.

Pool-04-11.jpg

Pool-04-12.jpg

All the tunnels and opening for the wiring and tubes were inspected before being put in place.

Pool-04-13.jpg

Another  corner done

Pool-04-14.jpg

All side done expect one which will be done the last minute next week when the pour in the concrete.

Pool-04-15.jpg

This is the technical room, where all the equipment will be housed.

Pool-04-16.jpg

The wiring and tubes coming from the technical room to the pool is getting ready as well.

Pool-04-17.jpg

Last thing the lads did was cut the metal wire mesh to fit the ground.

weekend.... no construction crew, but now it's the time for the gardeners. Never a dull moment....