The Pool Construction - Day 7
Saturday 17th April, 2010
By: Mike Werner
Location: Normandy, France
Category:  House 
 

Friday was a busy day, since not only was the trenches going to be dug for electricity and water, but also the gardener was coming to start working on the outer garden.

What that meant was:

Pool-7-01.jpg
2 digging machines at the same time....

Pool-7-02.jpg
The electricity and water have to come alongside the balcony/terrace, and on the extremities, we are taking into account that 2 3,000 Kw windmills will be installed in the nearby future, so might as well cable it up.

Pool-7-03.jpg
Digging started at the pool side.

Pool-7-04.jpg
While at the other side, the JCB was making a hill at the side for plants and trees.

Pool-7-05.jpg
Denis Blanchi concentrating so that he doesn't run into the balcony.

Pool-7-06.jpg
A long trench was made

Pool-7-07.jpg
Cables were drawn, and water pipes put down.

Pool-7-08.jpg
Ready for the electrician to connect up...