We're almost there. Today a liner specialist arrived with the pool builder. He was contracted by the pool company since he was a big specialist in putting up armed liner. After coffee, they set off to clean the pool from the rain water and dirt & leaves that had flown in.
Then they set rolls of armed liner on the ground, and...
drilled holes in the concrete bottom and placed the liner. Then...
they placed the next roll of liner onto top of the first one, and...
with a sort of electric hair-dryer running on turbo and steroids, melted the PVC onto each other, and using a small roller, "glued" the two pieces together.
After a whole day, everything was melted and glued into place...
...and at 18:00 water was let in (using the hose since the filters are going to be put to work only tomorrow).
Next week Friday, the shelter arrives, so until then, the water will be dirty with leaves, since it's windy here.
|